abstract:farber:status

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
abstract:farber:status [2018-03-21 13:03] sraskarabstract:farber:status [2020-04-03 11:24] (current) – [Ganglia Cluster Monitoring] anita
Line 1: Line 1:
-==== Node Status Notification====+==== Node Status Notification for Farber ====
  
 An opt-in node status notification service is available for Farber users.  This service sends an email notification when any nodes in your workgroup transition between two of the following states: An opt-in node status notification service is available for Farber users.  This service sends an email notification when any nodes in your workgroup transition between two of the following states:
Line 20: Line 20:
 ==== Ganglia Cluster Monitoring ==== ==== Ganglia Cluster Monitoring ====
 [[http://farber.hpc.udel.edu/ganglia/|Cluster monitoring]] for Farber uses [[http://ganglia.sourceforge.net/|Ganglia]] to monitor its hardware components. [[http://farber.hpc.udel.edu/ganglia/|Cluster monitoring]] for Farber uses [[http://ganglia.sourceforge.net/|Ganglia]] to monitor its hardware components.
- 
 ==== System Alerts ==== ==== System Alerts ====
-[[http://www.hpc.udel.edu/mantis/default/project_page.php?project_id=4|System alerts]]: Check here first if you are experiencing problems with the cluster.+[[https://www.hpc.udel.edu/mantis/default/my_view_page.php|System alerts]]: Check here first if you are experiencing problems with the cluster.
  
  
 ==== Job Statistics ==== ==== Job Statistics ====
 [[http://farber.hpc.udel.edu/jobstats/|Job statistics]]: Check here for the total number of jobs that ended on each day over a range (week, 2 weeks, month, 6 months, year) with an overlay of the total number of jobs which the job scheduler classified as "failed." [[http://farber.hpc.udel.edu/jobstats/|Job statistics]]: Check here for the total number of jobs that ended on each day over a range (week, 2 weeks, month, 6 months, year) with an overlay of the total number of jobs which the job scheduler classified as "failed."
  • abstract/farber/status.1521651838.txt.gz
  • Last modified: 2018-03-21 13:03
  • by sraskar