abstract:farber:status

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revisionBoth sides next revision
abstract:farber:status [2018-03-21 13:03] sraskarabstract:farber:status [2020-04-03 11:23] – [Ganglia Cluster Monitoring] anita
Line 1: Line 1:
-==== Node Status Notification====+==== Node Status Notification for Farber ====
  
 An opt-in node status notification service is available for Farber users.  This service sends an email notification when any nodes in your workgroup transition between two of the following states: An opt-in node status notification service is available for Farber users.  This service sends an email notification when any nodes in your workgroup transition between two of the following states:
Line 20: Line 20:
 ==== Ganglia Cluster Monitoring ==== ==== Ganglia Cluster Monitoring ====
 [[http://farber.hpc.udel.edu/ganglia/|Cluster monitoring]] for Farber uses [[http://ganglia.sourceforge.net/|Ganglia]] to monitor its hardware components. [[http://farber.hpc.udel.edu/ganglia/|Cluster monitoring]] for Farber uses [[http://ganglia.sourceforge.net/|Ganglia]] to monitor its hardware components.
 +
 +<note important>If connecting from off-campus, then you will need to connect via [[https://services.udel.edu/TDClient/32/Portal/KB/ArticleDet?ID=112
 +|VPN]] to access the [[http://farber.hpc.udel.edu/ganglia/|cluster monitoring]] for Farber.</note>
  
 ==== System Alerts ==== ==== System Alerts ====
-[[http://www.hpc.udel.edu/mantis/default/project_page.php?project_id=4|System alerts]]: Check here first if you are experiencing problems with the cluster.+[[https://www.hpc.udel.edu/mantis/default/my_view_page.php|System alerts]]: Check here first if you are experiencing problems with the cluster.
  
  
 ==== Job Statistics ==== ==== Job Statistics ====
 [[http://farber.hpc.udel.edu/jobstats/|Job statistics]]: Check here for the total number of jobs that ended on each day over a range (week, 2 weeks, month, 6 months, year) with an overlay of the total number of jobs which the job scheduler classified as "failed." [[http://farber.hpc.udel.edu/jobstats/|Job statistics]]: Check here for the total number of jobs that ended on each day over a range (week, 2 weeks, month, 6 months, year) with an overlay of the total number of jobs which the job scheduler classified as "failed."
  • abstract/farber/status.txt
  • Last modified: 2020-04-03 11:24
  • by anita